skip to Main Content

Interstate 210 Closure Sept 18-21 – Take the Roxford Exit off the 5 Freeway

 

Bulletin Notice

 

LOS ANGELES – The California Department of Transportation (Caltrans) announces a 55-hour weekend full closure of eastbound Interstate 210 (I-210) in Sylmar for paving work. The closure is the first in a series of 55-hour closures that will be conducted on I-210 in the San Fernando Valley. Residents and local businesses located near the freeway may experience noise, vibrations and dust associated with construction activities.

The closures are as follows:

  • Friday, September 18 at 11 p.m. through 5 a.m. Monday, September 21
  • Full closure of eastbound I-210 between Interstate 5 (I-5) and Yarnell St
    I-5 connector to eastbound I-210
  • Eastbound Yarnell St. on and off-ramp

Motorists will be detoured to the I-5 Roxford St. off-ramp or State Route 118 (SR-118) to reach their destinations.

Some closures may start and end later. All closures are weather permitting and subject to change. Motorists should expect delays and are encouraged to check traffic conditions before leaving to their destination by visiting the Caltrans Quickmap.

The work on I-210 is part of a $135.5 million project replacing all lanes of I-210 with new pavement from Wheatland Ave to I-5. The on and off-ramps, connectors and adjacent shoulders will also be rehabilitated. Overhead sign structures, traffic loop detectors, center median barrier, and the guardrail system will be upgraded. This project is funded by Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017.

Caltrans reminds drivers to be “Work Zone Alert” and to “Slow for the Cone Zone.”

 

Back To Top
Login
Log in below to access learning modules.
Forgot Password
Enter your email address or username and we’ll send you instructions to reset your password.